LoadCairn / UPS runtime guide

UPS runtime calculator guide

Estimate battery backup time from a connected load and battery-bank details. The UPS runtime calculator makes its energy method visible so engineers, facility managers, technicians, MEP consultants, and students can review the assumptions behind a planning estimate.

Estimate method

Nominal energy / planning only

Nominal bank energy = V × Ah × series batteries × parallel strings

Runtime = bank energy × efficiency fraction × remaining-capacity fraction ÷ load (W)

Efficiency and remaining capacity are percentages converted to fractions. The displayed runtime rounds to the nearest minute.

01 / Inputs and formula

What the estimate uses

First, nominal bank energy in watt-hours is voltage per battery multiplied by rated amp-hours per battery, batteries in series per string, and parallel strings. The calculator then applies UPS efficiency and remaining battery capacity before dividing by connected load in watts.

Runtime (hours) = nominal bank energy × (efficiency / 100) × (remaining capacity / 100) ÷ connected load (W).

The calculator displays the result rounded to the nearest minute.

Supported inputs

Connected real-power load
The equipment load in watts (W).
Nominal battery voltage
The voltage rating for one battery (V).
Rated battery capacity
The amp-hour rating for one battery (Ah).
Batteries in series per string
The count of batteries connected in each series string.
Parallel strings
The number of matching battery strings connected in parallel.
UPS efficiency
The estimated efficiency as a percentage.
Remaining battery capacity
The estimated capacity remaining as a percentage.

02 / Assumptions and limits

A planning estimate, with boundaries

The result is a planning estimate, not a guaranteed or model-specific runtime. Actual backup time depends on the UPS, batteries, operating conditions, and load behavior.

Assumes

  • The battery bank starts fully charged.
  • The connected real-power load stays constant.
  • Series and parallel battery arithmetic is ideal.

Does not model

  • No chemistry-specific Peukert or discharge-rate curve is applied.
  • No temperature correction is applied.
  • Inverter cutoff and battery-management limits are not modeled.
  • Power factor and inrush are not modeled.
  • The estimate is not calibrated to a specific manufacturer or UPS model.

For equipment decisions, consult the UPS and battery manufacturer’s data for the specific system and operating conditions.

03 / Run an estimate

Put your battery-bank values into the calculator

Change the inputs to compare planning scenarios, then review the formula and limits beside the result.