LoadCairn / UPS runtime
UPS runtime estimate
Current estimate from the values entered in the calculator.
Estimated runtime
3 h 27 minRounded to the nearest minuteCurrent inputs
- Connected load
- 1,000 W
- Nominal voltage per battery
- 12 V
- Rated capacity per battery
- 100 Ah
- Batteries in series per string
- 4 batteries
- Parallel strings
- 1 string
- UPS efficiency
- 90%
- Estimated remaining battery capacity
- 80%
Formula and calculation
- Battery-bank energy = nominal volts per battery × rated Ah per battery × batteries in series × parallel strings
- Usable energy = battery-bank energy × (UPS efficiency % ÷ 100) × (remaining capacity % ÷ 100)
- Runtime (hours) = usable energy (Wh) ÷ connected load (W); displayed runtime is rounded to the nearest minute
- 12 V × 100 Ah × 4 batteries × 1 string = 4,800 Wh
- 4,800 Wh × (90% ÷ 100) × (80% ÷ 100) = 3,456 Wh
- 3,456 Wh ÷ 1,000 W = 3.456 hours = 3 h 27 min
Assumptions
- The bank starts fully charged.
- The load is constant real power measured in watts.
- Series and parallel capacity arithmetic is ideal.
- Nameplate Ah is treated as available energy before the explicit efficiency and remaining-capacity factors.
- No chemistry-specific Peukert or discharge-rate curve is applied.
- No temperature correction is applied.
- No inverter cutoff, battery-management limit, power-factor or inrush behavior, or manufacturer calibration is modeled.
Planning limitations
- This is a nominal-energy estimate; it does not apply a chemistry-specific Peukert effect, discharge-rate curve, or manufacturer runtime curve.
- It does not model battery temperature or aging beyond the estimated remaining-capacity percentage entered above.
- It does not model inverter cutoff, battery-management limits, power factor, inrush, transient load, or changing load over time.
- It does not validate equipment compatibility, installation conditions, safety, electrical-code compliance, or a manufacturer warranty.
- Use model-specific manufacturer runtime data and qualified electrical review for equipment selection or design decisions.
Every result is an estimate for planning only—not a substitute for a licensed engineer’s design or manufacturer data.