Data center energy cost calculator.

Estimate monthly and annual facility energy and demand costs from rack IT load, rack count, electricity rate, and PUE. The monthly energy window is fixed at 730 hours.

Inputs

Adjust the estimate

Results update as you change a value. Calculations run in this browser.

kW
racks
$/kWh
$/kW/mo

Fixed monthly window: 730 hours. Demand charge defaults to $0 per kW per month.

Live results

Current estimate

Facility energy per rack · monthly

10,950 kWh

IT energy: 7,300 kWh per month.

Energy cost · per rack

$1,314.00 / month

$15,768.00 / year

Energy cost · all racks

$1,314.00 / month

$15,768.00 / year

Demand cost · per rack

$0.00 / month

$0.00 / year

Demand cost · all racks

$0.00 / month

$0.00 / year

Total cost · per rack

$1,314.00 / month

$15,768.00 / year

Total cost · all racks

$1,314.00 / month

$15,768.00 / year

Annual savings from 0.1 lower PUE · per rack

$1,051.20

Annual savings from 0.1 lower PUE · all racks

$1,051.20

Formula and calculation trace

IT kWh = IT kW × 730 · Facility kWh = IT kWh × PUE · Energy cost = facility kWh × rate · Demand cost = IT kW × PUE × demand charge

  1. Hours per month = 730 (fixed planning value).
  2. IT energy per rack = 10 kW × 730 h = 7,300 kWh/month.
  3. Facility energy per rack = 7,300 kWh × 1.50 PUE = 10,950 kWh/month.
  4. Energy cost per rack = 10,950 kWh × $0.12/kWh = $1,314.00/month; annual = $1,314.00 × 12 = $15,768.00.
  5. All-rack energy cost = $1,314.00/month × 1 = $1,314.00/month and $15,768.00/year.
  6. Demand cost per rack = 10 kW × 1.50 PUE × $0.00/kW/month = $0.00/month.
  7. All-rack demand cost = $0.00/month × 1 = $0.00/month.
  8. Total monthly cost per rack = $1,314.00 energy + $0.00 demand = $1,314.00; annual = $15,768.00.
  9. Total monthly cost for all racks = $1,314.00/rack × 1 = $1,314.00; annual = $15,768.00.
  10. Annual savings per rack from a 0.1 PUE reduction = 10 kW × 0.1 × 730 h × 12 × $0.12/kWh = $1,051.20.
  11. Annual savings for all racks = $1,051.20 × 1 = $1,051.20.

Published source: The Green Grid, White Paper #49, PUE: A Comprehensive Examination of the Metric (2012); 730 hours per month and the 0.1 PUE comparison are the stated calculator assumptions.

Assumptions and limits

  • The calculator uses 730 hours per month and 12 months per year; it does not model leap years, seasonality, or partial months.
  • PUE is applied to each rack’s IT energy as a planning allocation; actual facility overhead may not scale linearly with rack count.
  • Demand charge is optional and treated as a flat monthly $/kW rate applied to facility kW (IT kW × PUE). Taxes, utility riders, and contract minimums are excluded.
  • Annual PUE savings assumes the same IT load, electricity rate, and rack count, with PUE reduced by exactly 0.1.

Every result is an estimate for planning only—not a substitute for a licensed engineer's design or manufacturer data.

Planning guide / energy-cost

Introduction

The data-center energy-cost calculator estimates monthly and annual energy charges, demand charges, combined totals, and an annual energy-cost comparison from a per-rack IT load, rack count, electricity rate, power usage effectiveness, and demand-charge input. Use it to compare planning cases with a consistent set of assumptions or to make the effect of PUE and rack count visible before using a utility bill or tariff model.

The calculator fixes its monthly window at 730 hours and uses 12 months for annual totals. Enter the electricity rate in dollars per kWh and a demand charge in dollars per kW per month; the demand charge starts at zero. PUE must be at least 1. The page applies PUE to each rack’s IT energy and demand as a simplified planning allocation.

The example rate is only an editable input, not an offer or a claim about any utility price. Real bills can contain time-of-use rates, taxes, riders, minimums, power-factor terms, ratchets, seasonal demand, and billing windows that this tool does not represent. Use actual tariff documents and interval data for a financial analysis.

Method / Calculation

How it works

IT energy per rack is entered IT kW multiplied by 730 hours. Facility energy per rack multiplies that result by PUE. This turns a rack IT-energy estimate into a simplified facility-energy allocation; the calculator explicitly notes that overhead may not scale linearly with rack count.

Energy cost multiplies facility kWh by the entered rate. Annual energy cost is monthly energy cost multiplied by 12. The all-rack totals multiply the per-rack amounts by rack count. With a fixed rate and identical rack loads, this is a straightforward scaled scenario rather than a measured facility bill.

Demand cost per rack uses IT kW times PUE times the entered flat monthly demand charge. The tool adds that amount to energy cost for total cost. Actual utility demand billing may be calculated at a site or account peak and may not allocate linearly by rack, so the per-rack presentation is an assumption in this model.

The annual savings metric applies a PUE reduction of exactly 0.1 to IT load, 730 hours per month, 12 months, and the electricity rate. It includes the modeled energy charge only. It does not subtract demand charge savings or estimate a retrofit outcome.

IT kWh/month = IT kW per rack × 730 h

Facility kWh/month = IT kWh/month × PUE

Energy charge = facility kWh × rate; annual energy = monthly charge × 12

Demand charge = IT kW × PUE × entered $/kW/month

Annual 0.1-PUE energy comparison = IT kW × 0.1 × 730 × 12 × electricity rate

  1. Choose an IT kW per rack value and a positive whole rack count that represent one scenario. Keep the rack count and load basis consistent across comparisons.
  2. Enter a per-kWh rate from the tariff or planning assumption being evaluated. The tool accepts a nonnegative rate; retain the source and effective date outside the calculation.
  3. Enter PUE at or above 1.0. The model multiplies IT energy and power by PUE; it does not calculate PUE from facility meter data.
  4. Enter the flat monthly demand charge if you want it included. The default of zero is a valid scenario and leaves energy cost as the only modeled charge.
  5. Multiply IT kW by 730 to get monthly IT kWh, then apply PUE and the rate. Multiply per-rack amounts by rack count and by 12 for annual totals.
  6. Read the 0.1-PUE comparison as an annual energy-cost calculation only. Compare the inputs with a bill, tariff, and measured facility profile before using the output in a budget.

The page cites The Green Grid, White Paper #49, PUE: A Comprehensive Examination of the Metric (2012). Its 730-hour month, demand allocation, and fixed 0.1-PUE comparison are stated calculator assumptions, not utility pricing or an expected savings claim.

For a more detailed financial model, reconcile the meter boundary, billing period, tariff schedule, demand determinant, taxes and riders, seasonal changes, actual rack utilization, and PUE measurement method. This page does not import or verify any of those records.

The per-rack view is a normalization aid: it can help compare scenarios with a common rack basis, but it does not mean the utility bills each rack separately. The rack count scales the displayed scenario linearly, so an entered facility average may conceal unequal loading, reserved capacity, or changes over time. For a month-to-month comparison, use a consistent time window and meter boundary, and distinguish billed demand from an energy charge. Preserve the rate source and effective date with the calculation; a sample rate is only an editable example. The page’s energy-only PUE comparison intentionally does not include demand-charge changes or establish an achievable efficiency improvement.

Calculation trace / Illustrative inputs

Fully worked example

Illustrative calculation using the calculator’s defaults: 10 kW IT load per rack, one rack, $0.12/kWh as a sample editable rate, PUE 1.5, and $0/kW/month demand charge. The rate is a demonstration input, not a statement about a real utility tariff.

  1. IT energy per rack = 10 kW × 730 h = 7,300 kWh/month.
  2. Facility energy = 7,300 kWh × 1.5 PUE = 10,950 kWh/month.
  3. Energy charge = 10,950 kWh × $0.12/kWh = $1,314/month. Annual energy charge = $1,314 × 12 = $15,768.
  4. Demand charge = 10 kW × 1.5 × $0/kW/month = $0/month. Total modeled cost therefore remains $1,314/month or $15,768/year for one rack.
  5. Annual energy-cost comparison for a 0.1 lower PUE = 10 kW × 0.1 × 730 × 12 × $0.12 = $1,051.20. This excludes demand-charge changes.

Illustrative calculator result: 10,950 facility kWh per rack per month, $1,314 monthly modeled energy cost, $15,768 annual energy cost, and a $1,051.20 annual energy-only comparison for 0.1 lower PUE.

The example uses a sample rate and a fixed 730-hour month. It excludes tariff structure and other bill components. Planning estimate only; use actual utility records and a consistent meter boundary for financial decisions.

Review / Input checks

Common mistakes

Questions / Planning use

Frequently asked questions

Why does the calculator use 730 hours per month?

It is the fixed monthly window stated by the calculator. Monthly kWh and charges use that value, and annual values multiply the monthly result by 12 instead of using calendar billing periods.

Does the entered PUE come from a meter calculation?

No. PUE is an input. The calculator multiplies IT energy and power by that value as a planning allocation; it does not calculate or validate PUE from facility and IT meter readings.

How is the optional demand charge applied?

The tool multiplies IT kW per rack by PUE and the flat entered dollars-per-kW-per-month charge. It then scales that per-rack value by rack count. Confirm the actual tariff determinant before using the result.

Does the 0.1 PUE savings figure include demand charges?

No. The formula uses IT kW, 0.1, 730 hours, 12 months, and the electricity rate. It estimates an energy-charge comparison only and leaves demand-charge changes out.

What source basis does this page cite?

The calculator cites The Green Grid, White Paper #49, PUE: A Comprehensive Examination of the Metric (2012). The rate, fixed monthly hours, demand allocation, and 0.1 comparison are separately identified as assumptions.

Continue / Related tools

Save or export this estimate

Free calculator use stays open. Pro actions are checked when you choose one.

Estimates for planning only, not a substitute for a licensed engineer’s design or manufacturer data.