Review how the LoadCairn planning calculator compares total facility power with IT load, what its optional annual estimate assumes, and where the calculation stops.

Calculation method

Power inputs / planning only

  • PUE = total facility power ÷ IT load
  • DCiE (%) = IT load ÷ total facility power × 100 = 100 ÷ PUE
  • Non-IT overhead (kW) = total facility power − IT load

PUE compares facility power, the numerator, with IT load, the denominator. In this calculator, DCiE is the reciprocal percentage calculation shown above; it is not a separate benchmark claim.

Illustrative example · not a target or industry benchmark

500 kW facility ÷ 400 kW IT = PUE 1.25

400 kW IT ÷ 500 kW facility × 100 = DCiE 80%

500 kW facility − 400 kW IT = 100 kW non-IT overhead

These match the calculator’s editable starting values and demonstrate the arithmetic only.

01 / Inputs and assumptions

Match the measurement basis

The calculator uses entered power values for a planning comparison. Its optional annual energy and cost estimates extend those inputs with fixed assumptions.

02 / Limitations

A planning estimate, with boundaries

03 / Further reading

PUE source references

These references discuss PUE and its measurement. DCiE on this page is the calculator’s reciprocal calculation.